1936
1950s
1960s & 70s
1993
2000
2006
2009
2017
2021
2023
Gratiot Ave was originally constructed as a 20-foot concrete roadway from Eight Mile to 14 Mile roads
Major rehabilitation widens the three-lane boulevard
Major rehabilitation is done to widen lanes and overlay pavement
Roadway is resurfaced from 11 Mile to 14 Mile roads. Cost: $6.4 million
Gratiot Ave is micro-surfaced. Cost: $1.7 million
Roadway is resurfaced. Cost: $3.8 million
Preventive maintenance on cracks in the roadway takes place from Eight Mile to 14 Mile roads. Cost: $500K
Gratiot is resurfaced from Eight Mile to 14 Mile roads. Cost: $5.7 million
Major reconstruction begins to rebuild Gratiot Ave from 11 Mile to 14 Mile roads, removing original pavement, reconstructing with layers of gravel and dirt, resurfacing with asphalt, improving drainage, and making all ramps and sidewalks ADA compliant. Cost: $65 million
M-3 (Gratiot Avenue) is resurfaced between 14 Mile Road and Wellington Crescent in Macomb County, including resurfacing, concrete curb and gutter and drainage improvements, upgrades to sidewalks with American with Disabilities Act (ADA) ramps, installation of new modernized traffic signals, sign replacements, and pavement markings. Cost: $24 million.